Pacific Palisades Remodeling — Header
Now accepting fire rebuild projects
Pacific Palisades Remodeling
3,400 sq ft Rebuild with <em>ADU Addition, Rustic Canyon</em> — Pacific Palisades Remodeling
Rustic Canyon Pacific Palisades fire rebuild completed home with ADU 2026 exterior
Fire Rebuild
Fire Rebuild · Rustic Canyon · 2026

3,400 sq ft Rebuild with ADU Addition, Rustic Canyon

Location
Rustic Canyon, Pacific Palisades
Primary home
3,400 sq ft · 4 bed · 3 bath
ADU added
800 sq ft detached guest house
Total timeline
16 months · engagement to CO

Using the 110% rule and AB 462 to add an ADU that didn't exist before the fire

The Rustic Canyon home was 3,100 sq ft before the January 2025 fire. The family's primary goal was straightforward: rebuild what they had, as quickly as possible. But when we walked the lot, we noticed something: there was room on the north side for a detached ADU that had never been there before.

Under the current fire rebuild framework, the 110% footprint rule allows a primary home rebuild up to 10% larger than the pre-fire structure — with no design review. ADU square footage is calculated completely separately. The family could rebuild at 3,410 sq ft (just within the 110% limit) AND add a brand-new 800 sq ft detached ADU on the same lot — with neither affecting the other's permit process.

We submitted the primary home application and the ADU application simultaneously. The ADU used a pre-approved standard plan and was permitted in 6 business days. The primary home used a custom architect design and was permitted in 11 weeks. Construction on both started simultaneously. The ADU was completed first — the family moved in under AB 462 while the primary home was still being finished.

110% footprint rule — primary home at 3,410 sq ft
Previous home was 3,100 sq ft. Rebuilt at 3,410 sq ft — within the 110% limit, no design review, no conditional use permit.
Brand-new ADU where none existed before
New 800 sq ft detached ADU added under separate ADU pathway. Did not count against the 110% primary home limit.
Both permits submitted simultaneously
Primary home and ADU applications submitted to LADBS on the same day. ADU permit issued in 6 days; primary home in 11 weeks.
AB 462 — moved into ADU first
ADU received independent CO under AB 462. Family moved back to their Rustic Canyon lot while primary home construction continued.
WUI compliance on both structures
Full 2026 WUI code compliance on primary home and ADU. Both structures meet Class A roofing, ember-resistant venting, noncombustible cladding requirements.
$0 permit fees on both — EO No. 7
Primary home and ADU permit fees both waived. Combined savings: $31,400.

Rustic Canyon character, rebuilt and expanded

Rustic Canyon has some of the most beautiful mature oak and sycamore trees in Pacific Palisades. Many survived the fire while the structures did not. The rebuild design was oriented specifically to preserve the three mature oaks on the property — the architect worked around their root zones for foundation placement and setback calculations.

The primary home has a warm craftsman character that fits the canyon setting — natural material palette, covered porch, stone chimney. The interior opens to a rear yard that now connects to the ADU via a stone path through the landscape. The canyon feels larger with two structures on the lot than it did with one.

The ADU is positioned at the north edge of the lot — its own private entrance, its own patio, its own identity. It is not obviously an ADU from the street. The family uses it as a guest house currently and plans to rent it at $3,600/month when they no longer need it for guests. At current Rustic Canyon rental rates, the ADU will pay for itself in 7.5 years.

Completed fire rebuild Rustic Canyon Pacific Palisades primary home exterior craftsman style
Primary home exterior — craftsman character, mature oaks preserved, WUI-compliant
New detached ADU guest house Rustic Canyon Pacific Palisades fire rebuild lot
New detached ADU — 800 sq ft, private entrance, own patio
Rear yard connecting primary home and ADU Rustic Canyon Pacific Palisades
Rear yard — stone path connecting primary home and ADU through mature oak landscape
Project details
LocationRustic Canyon
Primary home3,410 sq ft
ADU800 sq ft
Previous size3,100 sq ft
110% increase used310 sq ft
ADU permit issued6 business days
Both permit fees$0 (EO No. 7)
Total timeline16 months
ADU rental potential$3,600/month
Thinking about adding an ADU to your rebuild?
Free site visit. We assess your lot and walk you through every option available for your specific situation.
Schedule a free site visit
Start your rebuild
More space, an income-producing ADU, and you never left the Palisades

Free site visit. No obligation. We tell you exactly what to do next — and we handle everything from there. CSLB License #982386.

Get a free consultation
Scroll to Top