Pacific Palisades Remodeling — Header
Now accepting fire rebuild projects
Pacific Palisades Remodeling
— Kitchen Remodeling · Pacific Palisades

The kitchen your home deserves.

Pacific Palisades kitchen remodeling — custom cabinetry, stone islands, and structural open-plan conversions. 18 years in the Palisades. CSLB #982386.

340+
Projects Done
18yrs
In Palisades
5
Avg Rating
Kitchen Remodel
$75K–$300K+
Typical Range
White Oak Cabinetry
Stone Waterfall Islands
Open-Plan Conversions
Kitchen Remodeling Trust — Pacific Palisades Remodeling
License
CSLB #982386 · Active
Class B General Contractor
Experience
18 Years in the Palisades
Kitchen remodeling specialists
Structural work
Load-Bearing Walls & Beams
Engineer + permit coordinated in-house
Rating
5★ · 107 Reviews
Google · Yelp · Houzz
Permits
LADBS · HOA · Coastal
All agencies handled simultaneously
Kitchen Styles — Pacific Palisades Remodeling
What Palisades homeowners are building

The most requested kitchen styles in 2026

After 18 years building kitchens exclusively in Pacific Palisades, we know exactly what works in these homes — architecturally, aesthetically, and for resale. These are the three styles we see most consistently requested, and the design language that defines each one.

Modern minimal kitchen Pacific Palisades flat slab cabinetry slab backsplash integrated appliances
Clean · Precise
Modern Minimal

Integrated appliances, slab backsplash, no visible hardware. Quiet luxury — every material earns its place.

Integrated appliances Slab backsplash No hardware
Warm traditional kitchen Pacific Palisades shaker cabinetry range hood stone counters
Timeless · Classic
Warm Traditional

Shaker cabinetry, brass hardware, decorative hood, apron-front sink. Built to last — and look right — for 30 years.

Shaker doors Brass hardware Decorative hood
Most requested features in Palisades kitchens right now
01
Open-plan conversion
Load-bearing wall removal — the single most requested and most transformative scope in a Palisades kitchen remodel
02
Large stone island
7–10 ft waterfall islands in natural stone — quartzite, marble, or bookmatched slabs. The visual centerpiece of every remodel
03
Professional appliances
Wolf, Sub-Zero, Miele, or Thermador. The Palisades market expects professional-grade — it affects resale and daily use equally
04
Indoor-outdoor connection
Sliding glass walls or La Cantina-style folding doors from the kitchen or dining to outdoor deck — essential in the Palisades market
Kitchen Remodel Budget — Pacific Palisades Remodeling
How to budget your kitchen

What does a kitchen remodel actually cost in Pacific Palisades?

National cost guides underestimate Palisades kitchen remodels by 40–60%. Labor rates here are 30–50% above national averages, and finish expectations start where national guides end. Here is an honest breakdown of what each tier delivers in this specific market.

Tier 1
$75K–$120K
Refresh — same layout, updated look
Cabinet refacing or painting, new stone counters, new backsplash, new fixtures, new appliances. No structural changes, no moving plumbing or electrical. Fast and impactful.
  • Cabinet refacing or repainting
  • New quartz or stone countertops
  • New tile backsplash
  • New fixtures and hardware
  • Standard appliance package
Timeline: 6–10 weeks
Tier 3
$200K–$320K
Full remodel with open-plan conversion
Everything in Tier 2 plus load-bearing wall removal, structural beam, MEP rerouting, and full open-plan conversion. The most transformative and most requested scope in the Palisades.
  • Load-bearing wall removal + steel beam
  • Custom cabinetry, stone, professional appliances
  • MEP rerouted through new open space
  • Full structural engineering + permits
  • Flooring unified across new open plan
Timeline: 18–26 weeks
Tier 4
$280K+
High-end gut remodel with additions
Gut remodel, structural reconfiguration, butler's pantry or scullery, imported stone, chef's appliance suite, full outdoor kitchen connection. Common in Riviera and Highlands properties.
  • Complete structural reconfiguration
  • Butler's pantry or prep kitchen
  • Imported bookmatched stone
  • Sub-Zero / Wolf / Miele full suite
  • Indoor-outdoor kitchen connection
Timeline: 24–36 weeks
What drives cost up
The 3 variables that move the number most

Structural work — load-bearing wall removal, beam installation, and MEP rerouting add $20,000–$60,000 but are the most impactful changes you can make. Cabinet specification — the gap between stock, semi-custom, and fully custom cabinetry is $30,000–$120,000 on a typical Palisades kitchen. Appliance tier — domestic professional brands (Wolf, Sub-Zero) vs. standard premium (Bosch, KitchenAid) differs by $15,000–$50,000 on a full kitchen package.

What you can control
Where your decisions have the most impact

Layout — staying in the existing footprint saves $20,000–$60,000 vs. structural reconfiguration. If the layout works, don't change it. Cabinet choice — semi-custom over custom saves $20,000–$60,000 with minimal visible difference in most kitchens. Stone selection — engineered quartz vs. natural stone can save $8,000–$25,000. We bring samples to your home so you can decide with real material in real light.

Free kitchen estimate
We visit your kitchen and give you a specific cost range — free, no obligation
Schedule a site visit
Kitchen Structural Work — Pacific Palisades Remodeling
The most impactful change

Opening your kitchen — what it involves

More than 80% of Palisades kitchen remodels we work on involve at least one load-bearing wall. In most 1950s–1970s Palisades homes, the wall between the kitchen and the rest of the house is structural. Removing it requires a licensed structural engineer, a permit, a steel or engineered lumber beam, and careful MEP rerouting — all of which we coordinate as part of the kitchen project scope.

Before compartmentalized galley kitchen Pacific Palisades 1960s closed floor plan
Before
The problem
Compartmentalized — kitchen isolated from the rest of the home
1960s galley or U-shape kitchen separated by load-bearing walls from the dining and living areas. Functional but disconnected — one person cooking, everyone else in another room.
After open plan kitchen Pacific Palisades steel beam load bearing wall removed custom cabinetry
After
The result
Open plan — kitchen, dining, living unified as one space
Steel beam carries the load overhead. Kitchen, dining, and living flow into one another. The transformation changes how the entire home functions — not just the kitchen.
What structural work involves Cost range Notes
Structural engineeringStamped drawings + load calculations
$2,500–$5,000
Required for permit submission
LADBS building permitPlan check + permit fee
$1,500–$4,000
Based on project valuation
Temporary shoringRequired before wall removal
$2,000–$5,000
Non-negotiable safety requirement
Steel or engineered beamSpan and load dependent
$8,000–$25,000
Steel vs. LVL beam; span length
MEP relocationElectrical, plumbing, HVAC in the wall
$3,000–$15,000
Most common budget surprise
Framing, drywall & finishesPost-beam ceiling and transition work
$5,000–$12,000
Ceiling patch, flooring transition
Total structural work addition to kitchen remodel budget
Before kitchen cabinetry, counters, or appliances
$22,000–$66,000
Kitchen Gallery — Pacific Palisades Remodeling
Kitchen Remodel FAQ & CTA — Pacific Palisades Remodeling
Common questions

What homeowners ask before they start

These are the questions we hear every week from Pacific Palisades homeowners planning a kitchen remodel.

Ask us directly
A cosmetic refresh (Tier 1, no structural) takes 6–10 weeks. A full cabinet replacement with new counters, appliances, and flooring (Tier 2) takes 14–20 weeks. A full remodel with structural open-plan conversion (Tier 3) takes 18–26 weeks. Cabinet lead time — 8–14 weeks for semi-custom, 10–16 weeks for custom — is often the critical path. We order cabinets before permits are approved to eliminate idle construction time.
In our experience, more than 80% of the kitchen-to-dining walls in 1950s–1970s Palisades homes are load-bearing. The only definitive answer comes from a licensed structural engineer who has reviewed the framing. An experienced contractor can give you a strong initial read at the site visit. We include a structural engineer assessment recommendation in every kitchen consultation where a wall removal is being considered.
The most commonly specified brands in Palisades kitchen remodels are Wolf (ranges and ovens), Sub-Zero (refrigeration), Miele (dishwashers, steam ovens), and Thermador (ranges and hoods). A complete professional appliance package from these brands runs $25,000–$65,000. For homeowners who want professional performance at a lower price point, Bosch and KitchenAid Professional deliver most of the functionality at roughly 40–60% of the cost.
Both are excellent — it depends on your priorities. Natural stone (quartzite, marble, granite) has character and geological uniqueness that cannot be replicated, commands a premium at resale in this market, and ages beautifully. It requires sealing and is more sensitive to acids. Engineered quartz is more uniform, virtually maintenance-free, and typically $30–$80/sq ft less expensive. The trend in Palisades kitchens in 2026 is toward natural stone with bold veining, particularly quartzite — it reads as more luxurious and differentiates the kitchen from a standard renovation.
A purely cosmetic refresh — new tile backsplash, new counters, new fixtures, no moved plumbing — typically does not require a permit. However, any structural work, electrical panel upgrade, plumbing relocation, or gas line modification requires an LADBS permit. We confirm permit requirements at the site visit for your specific scope. Non-permitted structural work creates real problems at resale and for insurance claims — it is not worth the shortcut.
Yes — most Palisades families stay in their homes throughout a kitchen remodel. We set up a temporary kitchen in another room, protect all adjacent living areas with dust barriers, and coordinate the most disruptive work (demo day, concrete cutting if needed) for times when the family is out. The kitchen will be non-functional for roughly 4–6 weeks during the middle of the project. We give you a specific construction schedule so you can plan around the most disruptive phases.
Luxury kitchen remodel Pacific Palisades completed evening interior warm lighting
Start your kitchen

The kitchen your home has always been waiting for.

Every kitchen remodel starts with a free site visit. We look at your space, understand what you want, and give you an honest budget range and timeline — before you commit to anything. No pressure. No sales pitch.

License
CSLB #982386
Class
B General Contractor
Experience
18 yrs · Palisades
Rating
5★ · 107 reviews
★★★★★

"We had a galley kitchen for 22 years. They took down the wall, put in a beam, and gave us the open kitchen we'd always talked about. The beam is the first thing every guest notices — it looks intentional, not structural."

P
Patricia & James K.
Alphabet Streets · Open plan conversion · $210,000
★★★★★

"The quartzite island alone is worth every penny. We went back and forth on natural stone vs quartz and they were right — nothing else would have looked like this. We get comments on it constantly."

L
Linda M.
The Riviera · Full kitchen remodel · $185,000
Scroll to Top